Commercial structure

Choose by what you want to access

Learning, tracking, proof, infrastructure, dashboard or contracting computing capacity. Each plan explains what it includes, who it is for, what it does not guarantee and the next step.

All plans are subject to registration review, technical availability, compliance and contract. Mining has variable output: no value represents a promise of returns. Prices may be adjusted.
Capacity plans · USD

Operational processing capacity

The greater the contracted capacity, the lower the cost per TH. The values below are the current commercial reference — output is always received in the account/wallet you designate.

Entry point

Free trial

Free

Get to know the logic of the ecosystem, the dashboard and the proof before signing up.

  • Demonstrative tracking
  • No commitment
  • Understand dashboard and operation
Who it's forThose who want to understand
Does not guaranteeOutput
Next stepGet demo
Acesso

NWM Utility Access

On request

Access to ecosystem utilities via the utility token.

  • Access to documentation
  • Utility in the ecosystem
  • Proof and dashboard according to plan
Who it's forCrypto audience
Does not guaranteeAppreciation
Next stepRequest access
Under contract

Hashrate Starter

US$ 2.243,52 / 100 TH · reference

Computing capacity lease to get to know the model.

  • Variable output
  • Specific contract
  • Tracking via dashboard
Who it's forFirst contact
Does not guaranteeYield
Next stepProposta
Most chosen

Hashrate Pro

US$ 9.198 / 500 TH · -18%

Greater capacity, reports and AriesEye proof with operational formalization.

  • Greater capacity
  • Periodic reports
  • AriesEye proof + operational formalization
Who it's forConsistency
Does not guaranteeMinimum output
Next stepContrato
Proof

AriesEye Oracle

On request

Monitoring, operational proof, dashboard and reports.

  • Monitoramento
  • Proof-of-operation
  • Dashboard and reports
Who it's forAuditoria
Does not guaranteeYield
Next stepDemonstration
On request

Enterprise / Energy

On request

Energy, mini data center, AI, 5G, mining and high consumption.

  • Energy projects
  • Mini data centers
  • Dedicated technical study
Who it's forEmpresas
Does not guaranteePreliminary feasibility
Next stepConsultoria
Educational simulator

Calculate the NWM for your plan

Adjust the capacity and term. NWM is calculated by the official formula (TH ÷ 100) × (dias ÷ 1.095).

de 80 a 1.200 TH
1.00000 NWM
NWM required (official formula)
Value in wei (18 decimals) — for the contract
Ref. production / day
Estimates based on the token formula. Actual output may vary significantly with mining difficulty; the cost in NWM varies with the market price of the token. This simulator does not constitute a promise of returns.
To estimate the BTC output with current difficulty and price, use the official ViaBTC calculator ↗. Lembre-se: the one who pays the BTC is the pool (ViaBTC or the one you designate), straight to your wallet.
Reference

Operational hashrate plans

All plans are charged in US dollars (USD), according to the official capacity base: 100, 200, 500 and 1,200 TH. The current values, the discount per range and the term are in the contract.

BTC output is variable and is not shown as a promise — the one who pays the output is the pool (ViaBTC), straight to the account/wallet designated by the client. Estimate it yourself on the public calculator.

Ready to move forward consciously?

Checkout only appears as a natural consequence of understanding. You can leave with a free trial, a proposal, a pre-contract or a payment started.

Not sure which capacity to choose?

Answer a few quick questions and the team prepares personalized guidance — with no commitment and no sensitive data.

Request a custom simulation